Salient
Features of Sardar Sarovar Project
Hydrology and
Reservoir:
| Hydrology:
|
| 1)
Total Catchment of Narmada |
97410
Sq.Km. |
MP
|
85859
Sq.Km(86.9%) |
Maharashtra
|
1658
Sq.Km.(1.6%) |
Gujarat
|
9894
Sq.Km.(11.5%) |
| 2)
Catchment area at dam site |
88000
Sq. Km |
| 3)
Length of river in Madhya Pradesh |
1077 Km |
| 4)
Length upto dam site |
1163.5
Km |
| 5)
Mean Annual Rainfall |
1120 mm |
|
|
| Reservoir: |
| 1)Length |
214
Km |
| 2)Maximum Width of Reservoir |
16.1 Km |
| 3)Average Width of Reservoir |
1.77Km |
| 4)FRL |
138.68m(455
ft) |
| 5)MDDL |
110.63m(363
ft) |
| 6)Gross
Storage |
9500
Mcum(7.70 MAF) |
| 7)Live
Storage |
5800
Mcum(4.73 MAF) |
| 8)Annual
Evaporation Loss |
616
Mcum(0.5 MAF) |
|
|
TOP
|